As a guest user you are not logged in or recognized by your IP address. You have
access to the Front Matter, Abstracts, Author Index, Subject Index and the full
text of Open Access publications.
Aiming at the serious problem of dust pollution in blasting work, the dust generation law and dust-bearing air flow time and space evolution law of blasting working face is analyzed and studied, and the optimal dust-exhausting wind speed of blasting work was 1.5 m/s. Combining with the dust production characteristics and wind speed conditions of the 107 blasting face in Dongling Coal Mine, Chongqing, Comprehensive dust prevention measures such as high-efficiency water cannon mud, high-pressure spray dust reduction, and dust concentration over-limit spray dust reduction are adopted to control the dust from the source and cut off the dust diffusion path, and the total dust reduction efficiency reached 94.8%, the respirable dust reduction efficiency reached 92%, and a good dust reduction effect has been achieved, which provides a basic basis for the control of dust in the blast mining work.
This website uses cookies
We use cookies to provide you with the best possible experience. They also allow us to analyze user behavior in order to constantly improve the website for you. Info about the privacy policy of IOS Press.
This website uses cookies
We use cookies to provide you with the best possible experience. They also allow us to analyze user behavior in order to constantly improve the website for you. Info about the privacy policy of IOS Press.